[1 of 4]
< Previous
Next >
Filling and compacting crawl space for FOUR. Little, tiny, mini excavator plopped right inside for spreading rock and sand and compacting.
There is Alice's swimming pool in background plus the remaining days of the Arbutus trees and fir stumps.
Ralph Hull
Jun 8, 2015, 3:22 PM Apple Iphone 4 77 mm f/2.8 1/1160 sec 80 iso
IMG_1621.jpg
[2 of 4]
< Previous
Next >
Plywood sheathing on roof of TWO. Shot taken from east end of Common House deck, overlooking crawl space of FOUR.
Ralph Hull
Jun 8, 2015, 3:22 PM Apple Iphone 4 77 mm f/2.8 1/1117 sec 80 iso
IMG_1622.jpg
[3 of 4]
< Previous
Next >
The second level of the elevator shaft and lobby.
Ralph Hull
Jun 8, 2015, 3:25 PM Apple Iphone 4 77 mm f/2.8 1/197 sec 80 iso
IMG_1624.jpg
[4 of 4]
< Previous
Next >
At last, excavation on THREE. It is a little behind schedule because of extraordinary excavation. It will require nine feet of rock fill just to get to grade. A better solution is being researched, a basement under THREE. I wonder if Alice's swimming pool will be indoors?
Ralph Hull
Jun 8, 2015, 5:30 PM Apple Iphone 4 77 mm f/2.8 1/1117 sec 80 iso
IMG_1626.jpg