[Jul 12, 2015]
[1 of 6]   
< Previous 
 Next >
For those keeping a running count of weekly photos leading up to a year long time lapse this is the original position with the nearby post blocking the cut off tree.
Ralph Hull   Jul 12, 2015, 1:32 PM  Apple Iphone 4   77 mm  f/2.8  1/1774 sec  80 iso    IMG_1767.jpg
 
[2 of 6]   
< Previous 
 Next >
This is the secondary position from the gazebo door with the nearby post blocking the chimney of the Common House, which can no longer be seen.
Ralph Hull   Jul 12, 2015, 1:33 PM  Apple Iphone 4   77 mm  f/2.8  1/1885 sec  80 iso    IMG_1768.jpg
 
[3 of 6]   
< Previous 
 Next >
This position doesn't date back as far as the other two but it is a nicer shot including water and beach. You can see that FOUR is up and running. It is roofed with roll on torch on. Forms for THREE are starting just today, Monday 150713.
Ralph Hull   Jul 12, 2015, 1:33 PM  Apple Iphone 4   77 mm  f/2.8  1/1160 sec  80 iso    IMG_1769.jpg
 
[4 of 6]   
< Previous 
 Next >
Ralph Hull   Jul 12, 2015, 10:12 PM  Apple Iphone 4   77 mm  f/2.8  1/17 sec  400 iso    IMG_1778.jpg
 
[5 of 6]   
< Previous 
 Next >
As discussed at the last site meeting the plan is to remove the stairs and this wall immediately, like tomorrow, so that the fire sprinkler crew can place the scaffolding where the stairs used to be.
Ralph Hull   Jul 12, 2015, 10:13 PM  Apple Iphone 4   77 mm  f/2.8  1/17 sec  250 iso    IMG_1779.jpg
 
[6 of 6]   
< Previous 
 Next >
Hope we can salvage the oak treads. Now the dust begins but it will be poly protected.
Ralph Hull   Jul 12, 2015, 10:14 PM  Apple Iphone 4   77 mm  f/2.8  1/17 sec  500 iso    IMG_1780.jpg